Executive Disadvantages in the Layered Wall of the Facade
 
More details
Hide details
1
University of Zielona Gora, Faculty of Building, Architecture and Environmental Engineering, Z. Szafrana st 1, 65-516 Zielona Góra, tel.+48683282320, Poland
 
2
University of Zielona Gora, Faculty of Building, Architecture and Environmental Engineering, Z. Szafrana st 1, 65-516 Zielona Góra, tel.+48683283282251, Poland
 
 
Online publication date: 2016-10-21
 
 
Publication date: 2016-09-01
 
 
Civil and Environmental Engineering Reports 2016;22(3):55-60
 
KEYWORDS
ABSTRACT
In this paper a case of three-layer wall and fitting windows is described. The walls outside layer are made of clinker brick. The public basis is a situation, which occurred in an office building. In this building was a water stain on the windows inside the upstairs part the building, during the rain. In project of the building there were no details of performing three-layer wall and fitting of windows. In Poland one did not described in detail the realization for windows installation in three-layer wall.
 
REFERENCES (3)
1.
„Ekspertyza budowlana dotycząca przyczyn powstania zacieków podczas opadów nad oknami wewnątrz pomieszczeń biurowych w budynku w Zielonej Górze”. Wykonana przez PZITB Oddział w Zielonej Górze wrzesień 2014 r.
 
2.
Dylla A.: Właściwości fizykalne ocieplonych przegród zewnętrznych. ABC izolacje.pl.
 
3.
www.crh-klinkier.pl.
 
eISSN:2450-8594
ISSN:2080-5187
Journals System - logo
Scroll to top